right_graphic
water engineering
 
02 Splashlandings, Alton Towers
line
  Feature Details A water park with 1000m2 of water, indoor pools, outdoor pools, flumes, Master Blaster, childrens tower, river, tipping bucket and many other features.
Client Madame Tussauds
Completion 2003
Construction Cost £12,000,000
Our Role Design reviews of the water treatment and water feature systems; site monitoring of installation and commissioning.
Design Team
 
line
  Architect Shepherd Design
Aquatic Consultant Devin
M & E Engineers Shepherd Design

graph
puretechnology
kyoung@devin.be+44 (0)191 258 1653