right_graphic
water engineering
 
02 Loughborough University
line
  Pool Details 50m x 17m pool with movable floor and traversable boom.
  Client Loughborough University
  Completion 2002
  Construction Cost £6,000,000
  Our Role Water treatment, movable floor and traversable boom.
 
Design Team
 
line
  Architect FaulknerBrowns
  Aquatic Consultant Devin
  M & E Engineers Max Fordham
     

graph
puretechnology
kyoung@devin.be+44 (0)191 258 1653